7Goldsworthy LL 2ndBedroom 2009JAN16 001  Things are starting to move along now that I'm starting to get the walls put up. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009JAN16 002  Just for shits & giggles, I've installed a window in the shower to let some much needed light in. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009JAN16 003  I'm using all steel studs on all the walls - termites can't eat through that yet. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009JAN16 004 : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009JAN16 005  My mate "Macca" had his work cut out levelling up the floors. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009JAN16 006  At the perimeter walls, the floor had to be raised nearly 100 millimeters or 4 inches. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville 
7Goldsworthy LL 2ndBedroom 2009JAN16 007 : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009JAN16 008  This photo shows just how much material was added to the floors. : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville  7Goldsworthy LL 2ndBedroom 2009JAN16 009 : 2009, 2nd Bedroom, 7 Goldsworthy Street, Australia, January, QLD, Townsville